Life Style: façade complete, interior finishing under way
Life Style at 53 Angisa Street is built: the monolithic frame, the Alucobond ventilated façade, the windows and two Mitsubishi lifts are in place. Interior finishing of…

On 1 September Imedi TV’s evening “Chronicle” aired a report on safety at construction sites in Georgia, and the RED construction site was one of the locations featured. Project director Beglar Bolkvadze explained how work is organised: daily safety briefings, fall-protection systems at height, protected lift shafts and hazardous zones, and constant compliance control.
Life Style at 53 Angisa Street is built: the monolithic frame, the Alucobond ventilated façade, the windows and two Mitsubishi lifts are in place. Interior finishing of…
In early October, excavation at the History site was almost complete, and on the night of 13 October the first monolithic slab was poured. By 27 October the crew was…
On 30 September, the day after the PRESALE opened, AB Development presented IMPERIAL · BATUMI to Batumi real estate agents. Partners heard about the concept of the club…